Ariane 6 launch table moved to pad

The 700 tonne steel table that will support Ariane 6 at liftoff was transferred to the pad at Europe’s Spaceport in French Guiana on 10 September 2018.

It is so large that it arrived in parts by ship in February and was then welded together and fitted with equipment at a preparation area 250 m from the launch pad. Moving this giant 4 m high, 20 m long and 18 m wide table to its permanent position on the centre of the pad is complex.

Four hydraulic jacks lifted the table then two trollies moved the table to the edge of the launch pad. A temporary railway and a mechanical guidance system helped roll the table into position over the centre of the pad where it will be lowered with millimeter precision into its final position.

Further mechanical, fluidic and electrical equipment will be installed inside and outside the table.

Credits: ESA/CNES 2018

Learn more about #Ariane6: http://ariane6.esa.int/

★ Subscribe: http://bit.ly/ESAsubscribe

Check out our full video catalog: http://bit.ly/SpaceInVideos
Follow ESA on Twitter: http://bit.ly/ESAonTwitter
On Facebook: http://bit.ly/ESAonFacebook
On Instagram: http://bit.ly/ESAonInstagram
On Flickr: http://bit.ly/ESAonFlickr

ESA is Europe’s gateway to space. Our mission is to shape the development of Europe’s space capability and ensure that investment in space continues to deliver benefits to the citizens of Europe and the world. Check out http://www.esa.int/ESA to get up to speed on everything space related.

Copyright information about our videos is available here: http://www.esa.int/spaceinvideos/Terms_and_Conditions

Leave a Reply